The automatically hygienic WC !
The installer arrives on the ready prepared site...

1. Installation of the flexible stainless steel connector
onto the inlet stop-tap 12/17 mm
In the case of HARRY'S NEW YORK BAR - the works were carried out by the
bar's own contractors: tiling, plumbing and electricity provision from a building
behind the WCs...
3. Drilling though the rear wall using a 10mm bit to allow the cabling of
the supply jack-plug...
4. Drilling the plugs using an 8 mm bit - the holes being located using
the toilet bowl as a template...
5. Water supply - OK
Waste connection - OK
Electrical supply - OK
... Clean up site - OK ....
The installation of the Hygiseat can now begin !!
2. Electrical supply: finding the ideal place in the building behind the
toilet wall to drill through, avoiding the installation of a socket in the
WC...